SCHEDULING THE PRODUCTION OF PREFABRICATION CONSTRUCTION SUPPLY CHAINS CONSIDERING VARIABLE DELIVERY TIMES

Title
SCHEDULING THE PRODUCTION OF PREFABRICATION CONSTRUCTION SUPPLY CHAINS CONSIDERING VARIABLE DELIVERY TIMES
Authors
Ho, Chung; Zabinsky, Zelda B.; Kim, Yong-Woo
Ewha Authors
김용우
SCOPUS Author ID
김용우scopus
Issue Date
2026
Journal Title
JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
ISSN
1392-3730JCR Link

1822-3605JCR Link
Citation
JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT vol. 32, no. 3, pp. 415 - 432
Keywords
supply chain; scheduling; prefabrication; modularization; construction; optimization; uncertainty; stochastic programming.
Publisher
VILNIUS GEDIMINAS TECH UNIV
Indexed
SCIE; SCOPUS WOS scopus
Document Type
Article
Abstract
cently. The efficiency of prefabrication supply chains yields substantial advantages for construction projects. A challenge is the variability in delivery times, which negatively impacts the economy and reliability of prefabrication supply chains. Most construction prefabrication suppliers have difficulty adjusting their schedules in response to delivery time changes in a timely manner. Despite this critical challenge, limited research has addressed proactive and robust production scheduling to mitigate these uncertainties. This study investigates a method for proactive and robust production scheduling for construction prefabrication suppliers, particularly those with multiple fabrication shops, responding to changes in delivery times. This paper introduces a multi-objective, two-stage stochastic programming model that facilitates the production planning with multiple fabrication shops, considering variable delivery times. Computational results from an experimental study demonstrate that the proposed optimization model achieves a 14.6% cost reduction compared to the traditional EDD method. Computational results also show that the expected cost of the stochastic programming model achieves a cost reduction of 0.23% compared to a deterministic model. These findings suggest the model's capability to generate robust and flexible schedules that effectively balance cost minimization with time reduction.
DOI
10.3846/jcem.2026.26156
Appears in Collections:
공과대학 > 건축도시시스템공학과 > Journal papers
Files in This Item:
26156.pdf(2.26 MB) Download
Export
RIS (EndNote)
XLS (Excel)
XML


qrcode

BROWSE