View : 476 Download: 0

Full metadata record

DC Field Value Language
dc.contributor.author이준성*
dc.contributor.author손정욱*
dc.date.accessioned2022-10-27T16:31:16Z-
dc.date.available2022-10-27T16:31:16Z-
dc.date.issued2022*
dc.identifier.issn2076-3417*
dc.identifier.otherOAK-32334*
dc.identifier.urihttps://dspace.ewha.ac.kr/handle/2015.oak/262682-
dc.description.abstractA discrete-event simulation (DES) model was developed to enhance the reinforcing bar (rebar) fabrication efficiency for multiple simultaneous projects at different sites. The production volume and procedure of the actual rebar fabrication plant were compared to the simulation model to ensure its accuracy. By determining the loss rate and necessary processing time, the fabrication plan was then optimized. The rebar type and machine features, which influence the loss rate and time required for rebar fabrication, were configured as the parameters in a discrete-event simulation model. The model considers a situation in which a rebar fabrication plant simultaneously delivers rebars to multiple sites. In this manner, the model can quantify the loss rate and time required in the fabrication process. The determination of the loss rate according to the import ratio of raw steel, site combination, and length can help optimize the rebar fabrication plan and increase work efficiency. In the considered scenario, a two-site combination and import ratio of raw steel of 2:1 (8 m:10 m) was noted to corresponded to the maximum decrease in the loss rate and required time. By extending the proposed approach to the complete rebar process (processing-transportation-construction), the plant member production process can be optimized.*
dc.languageEnglish*
dc.publisherMDPI*
dc.subjectrebar fabrication*
dc.subjectdiscrete-event simulation*
dc.subjectsimultaneous delivery*
dc.subjectrebar loss*
dc.subjectproduction process optimization*
dc.titleRebar Fabrication Plan to Enhance Production Efficiency for Simultaneous Multiple Projects*
dc.typeArticle*
dc.relation.issue18*
dc.relation.volume12*
dc.relation.indexSCIE*
dc.relation.indexSCOPUS*
dc.relation.journaltitleAPPLIED SCIENCES-BASEL*
dc.identifier.doi10.3390/app12189183*
dc.identifier.wosidWOS:000856229700001*
dc.identifier.scopusid2-s2.0-85138656728*
dc.author.googleHong, Eunbin*
dc.author.googleYi, June-Seong*
dc.author.googleSon, JeongWook*
dc.author.googleHong, MinYoung*
dc.author.googleJang, YeEun*
dc.contributor.scopusid이준성(24172023400)*
dc.contributor.scopusid손정욱(34868873100)*
dc.date.modifydate20240322111640*
Appears in Collections:
공과대학 > 건축도시시스템공학과 > Journal papers
Files in This Item:
There are no files associated with this item.
Export
RIS (EndNote)
XLS (Excel)
XML


qrcode

BROWSE