Identifying Critical Risk Factors and Management Activities for Effective Offsite Construction Projects during Construction Phase

Title
Identifying Critical Risk Factors and Management Activities for Effective Offsite Construction Projects during Construction Phase
Authors
Lee S.Jang Y.Yi J.-S.Son J.
Ewha Authors
이준성손정욱
SCOPUS Author ID
이준성scopus; 손정욱scopus
Issue Date
2023
Journal Title
Journal of Management in Engineering
ISSN
0742-597XJCR Link
Citation
Journal of Management in Engineering vol. 39, no. 4
Keywords
Importance-performance analysisManagement activitiesOff-site construction (OSC)Risk factorRisk management
Publisher
American Society of Civil Engineers (ASCE)
Indexed
SCIE; SCOPUS WOS scopus
Document Type
Article
Abstract
Off-site construction (OSC) has been drawing attention as a solution to the internal and external problems that the construction industry is facing. This study identified and analyzed the critical risk factors and activities to manage during OSC project execution, including production, transportation, assembly, and integration. Twelve critical risk factors and 50 management activities were derived from the existing literature. OSC experts scored each attribute's importance and performance, and reliability was tested with Cronbach's alpha. Results represented by an importance and performance analysis (IPA) matrix showed low performance and high importance of OSC projects. Poor human resources management had the highest importance, whereas lifting error had the highest performance. Production planning error ranked lowest in both importance and performance. Hence, OSC projects need to improve performance further, and intensive management should be used to minimize the performance-importance imbalance. © 2023 American Society of Civil Engineers.
DOI
10.1061/JMENEA.MEENG-5310
Appears in Collections:
공과대학 > 건축도시시스템공학과 > Journal papers
Files in This Item:
There are no files associated with this item.
Export
RIS (EndNote)
XLS (Excel)
XML


qrcode

BROWSE