View : 338 Download: 0

Full metadata record

DC Field Value Language
dc.contributor.author손정욱*
dc.contributor.author황성주*
dc.date.accessioned2023-01-04T16:31:12Z-
dc.date.available2023-01-04T16:31:12Z-
dc.date.issued2022*
dc.identifier.issn2075-5309*
dc.identifier.otherOAK-32581*
dc.identifier.urihttps://dspace.ewha.ac.kr/handle/2015.oak/263004-
dc.description.abstractThere has been increasing interest in the off-site construction (OSC) method in response to issues such as stagnant labor productivity, shortage of skilled workers, challenging site management, heightened safety and health-related regulations, and the push for carbon neutrality. Although efficient performance of an OSC project requires development of management techniques, and application of a management system that reflects the characteristics of the OSC projects, related technologies remain in their infancy. In this study, targeting precast concrete (PC) construction, which is one of the representative construction types of the OSC method, we derive the characteristics of OSC project management in six aspects: production place and time, production process, production method of construction, production method, production entity and facilities, and production environment. Based on this result, we further derived the requirements for developing an OSC project management system. Furthermore, based on the derived requirements, we constructed a system development scenario for the establishment of an installation plan and shipment requests. The managerial characteristics and requirements of the OSC project, presented in this study, provide the theoretical basis for developing OSC project management techniques, as well as guidance for the development of the OSC project management system in the future.*
dc.languageEnglish*
dc.publisherMDPI*
dc.subjectoff-site construction*
dc.subjectprefabrication*
dc.subjectproject management system*
dc.subjectrequirement engineering*
dc.subjectconstruction management*
dc.titleRequirements Analysis for Development of Off-Site Construction Project Management System: Focusing on Precast Concrete Construction*
dc.typeArticle*
dc.relation.issue10*
dc.relation.volume12*
dc.relation.indexSCIE*
dc.relation.indexSCOPUS*
dc.relation.journaltitleBUILDINGS*
dc.identifier.doi10.3390/buildings12101499*
dc.identifier.wosidWOS:000874354700001*
dc.author.googleJang, YeEun*
dc.author.googleSon, JeongWook*
dc.author.googleHwang, Sungjoo*
dc.contributor.scopusid손정욱(34868873100)*
dc.contributor.scopusid황성주(56292907200)*
dc.date.modifydate20240322111640*
Appears in Collections:
공과대학 > 건축도시시스템공학과 > Journal papers
Files in This Item:
There are no files associated with this item.
Export
RIS (EndNote)
XLS (Excel)
XML


qrcode

BROWSE