2013 | A new approach to improving the responsiveness to price fluctuations of the range estimating model through autocorrelation time-series analysis | 이준성 | Article |
2012 | A suggested color scheme for reducing perception-related accidents on construction work sites | 이준성 | Article |
2017 | Activity-based life cycle analysis of a curtain wall supply for reducing its environmental impact | 이준성 | Article |
2022 | BIM-Based Management System for Off-Site Construction Projects | 이준성; 손정욱 | Article |
2016 | BIM-integrated construction operation simulation for just-in-time production management | 이준성; 손정욱 | Article |
2016 | BIM-Integrated Construction Operation Simulation Framework for Lean Construction Planning | 장수원 | Master's Thesis |
2021 | Classifying the level of bid price volatility based on machine learning with parameters from bid documents as risk factors | 이준성; 손정욱 | Article |
2021 | Construction Disputes and Associated Contractual Knowledge Discovery Using Unstructured Text-Heavy Data: Legal Cases in the United Kingdom | 이준성 | Article |
2022 | Construction workers’ awareness of safety information depending on physical and mental load | 이준성; 손정욱; 황성주 | Article |
2019 | Convolutional Neural Networks 기반 건설재해 분류 모델 개발에 관한 연구 | 강현빈 | Master's Thesis |
2022 | CTGAN을 활용한 인공신경망 기반의 제로에너지건축물 공사비 예측에 관한 연구 | 홍은빈 | Master's Thesis |
2019 | Development of Automatic-Extraction Model of Poisonous Clauses in International Construction Contracts Using Rule-Based NLP | 이준성; 손정욱 | Article |
2013 | Development of web-based design management system through user participatory design and use-case modeling | 이준성 | Article |
2020 | Effective Risk Positioning through Automated Identification of Missing Contract Conditions from the Contractor's Perspective Based on FIDIC Contract Cases | 이준성; 손정욱 | Article |
2013 | Environmental impacts comparison between on-site vs. prefabricated Just-In-Time (prefab-JIT) rebar supply in construction projects | 이준성 | Article |
2017 | Establishment of Growth Strategies for International Construction Firms by Exploring Diversification-Related Determinants and Their Effects | 이준성; 손정욱 | Article |
2023 | Identifying Critical Risk Factors and Management Activities for Effective Offsite Construction Projects during Construction Phase | 이준성; 손정욱 | Article |
2023 | Image Generation of Hazardous Situations in Construction Sites for DNN Model Training using Text-to-Image Synthesis | 김하영 | Master's Thesis |
2008 | Insulation plan of aluminum curtain wall-fastening unit for high-rise residential complex | 송승영; 이준성 | Article |
2019 | Korean public rental housing for residential stability of the younger population: analysis of policy impacts using system dynamics | 이준성; 황성주 | Article |
2019 | Pre-bid clarification 문서 분석 중심의 공공건설프로젝트 입찰가격 변동성 수준 분류 모델 개발 | 장예은 | Master's Thesis |
2017 | Predicting Project's Uncertainty Risk in the Bidding Process by Integrating Unstructured Text Data and Structured Numerical Data Using Text Mining | 이준성 | Article |
2022 | Rebar Fabrication Plan to Enhance Production Efficiency for Simultaneous Multiple Projects | 이준성; 손정욱 | Article |
2016 | Supply chain cost model for prefabricated building material based on time-driven activity-based costing | 이준성 | Article |
2013 | 가구 구조 변화를 반영한 시스템 다이내믹스 기반 주택 수요-공급 분석 모델 | 오진희 | Master's Thesis |
2013 | 건설조직의 BIM 수행역량 성숙도 진단 및 인식비교에 관한 연구 | 강혜민 | Master's Thesis |
2016 | 건축물 에너지 성능 향상을 위한 외단열 시스템 적용 공동주택 리모델링 사업의 경제성 평가 | 이소정 | Master's Thesis |
2022 | 공공데이터를 활용한 복합용도 건축물의 에너지사용량 벤치마킹 모델 개발 | 임지연 | Doctoral Thesis |
2015 | 교육시설 유지관리 서비스 재원 배분 우선도 의사결정 지원 모델 | 신승우 | Doctoral Thesis |
2010 | 국내 건축설계조직의 BIM 수행능력 진단모델 개발 | 이지희 | Master's Thesis |