Browsing byAuthor이준성

Jump to:
All A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
  • Sort by:
  • In order:
  • Results/Page
  • Authors/Record:

Showing results 5 to 34 of 41

Issue DateTitleAuthor(s)Type
2022BIM-Based Management System for Off-Site Construction Projects이준성; 손정욱Article
2016BIM-integrated construction operation simulation for just-in-time production management이준성; 손정욱Article
2016BIM-Integrated Construction Operation Simulation Framework for Lean Construction Planning장수원Master's Thesis
2021Classifying the level of bid price volatility based on machine learning with parameters from bid documents as risk factors이준성; 손정욱Article
2021Construction Disputes and Associated Contractual Knowledge Discovery Using Unstructured Text-Heavy Data: Legal Cases in the United Kingdom이준성Article
2022Construction workers’ awareness of safety information depending on physical and mental load이준성; 손정욱; 황성주Article
2019Convolutional Neural Networks 기반 건설재해 분류 모델 개발에 관한 연구강현빈Master's Thesis
2022CTGAN을 활용한 인공신경망 기반의 제로에너지건축물 공사비 예측에 관한 연구홍은빈Master's Thesis
2019Development of Automatic-Extraction Model of Poisonous Clauses in International Construction Contracts Using Rule-Based NLP이준성; 손정욱Article
2013Development of web-based design management system through user participatory design and use-case modeling이준성Article
2020Effective Risk Positioning through Automated Identification of Missing Contract Conditions from the Contractor's Perspective Based on FIDIC Contract Cases이준성; 손정욱Article
2013Environmental impacts comparison between on-site vs. prefabricated Just-In-Time (prefab-JIT) rebar supply in construction projects이준성Article
2017Establishment of Growth Strategies for International Construction Firms by Exploring Diversification-Related Determinants and Their Effects이준성; 손정욱Article
2023Identifying Critical Risk Factors and Management Activities for Effective Offsite Construction Projects during Construction Phase이준성; 손정욱Article
2023Image Generation of Hazardous Situations in Construction Sites for DNN Model Training using Text-to-Image Synthesis김하영Master's Thesis
2008Insulation plan of aluminum curtain wall-fastening unit for high-rise residential complex송승영; 이준성Article
2024IPA 기법 및 프로젝트 개선지수(PPSI)를 활용한 Off-Site Construction 프로젝트 중점 관리요인 도출노희진Master's Thesis
2019Korean public rental housing for residential stability of the younger population: analysis of policy impacts using system dynamics이준성; 황성주Article
2019Pre-bid clarification 문서 분석 중심의 공공건설프로젝트 입찰가격 변동성 수준 분류 모델 개발장예은Master's Thesis
2017Predicting Project's Uncertainty Risk in the Bidding Process by Integrating Unstructured Text Data and Structured Numerical Data Using Text Mining이준성Article
2022Rebar Fabrication Plan to Enhance Production Efficiency for Simultaneous Multiple Projects이준성; 손정욱Article
2016Supply chain cost model for prefabricated building material based on time-driven activity-based costing이준성Article
2013가구 구조 변화를 반영한 시스템 다이내믹스 기반 주택 수요-공급 분석 모델오진희Master's Thesis
2013건설조직의 BIM 수행역량 성숙도 진단 및 인식비교에 관한 연구강혜민Master's Thesis
2016건축물 에너지 성능 향상을 위한 외단열 시스템 적용 공동주택 리모델링 사업의 경제성 평가이소정Master's Thesis
2022공공데이터를 활용한 복합용도 건축물의 에너지사용량 벤치마킹 모델 개발임지연Doctoral Thesis
2015교육시설 유지관리 서비스 재원 배분 우선도 의사결정 지원 모델신승우Doctoral Thesis
2010국내 건축설계조직의 BIM 수행능력 진단모델 개발이지희Master's Thesis
2015글로벌 건설기업의 해외 사업영역 다각화와 경영성과의 관계 연구성유경Doctoral Thesis
2016사업추진기간에 따른 행복주택 주거수요 영향관계 분석김민경Master's Thesis

BROWSE